Below is the engineered drawing that will be used to accept bids for the project.

  • Sidewalk length approximately 440' 

  • Contractor will be responsible for all permits required.

  • All work shall be performed in accordance with the 2020 edition of the Idaho Standards for Public Works Construction (ISPWC).

  • Future Parking Lot Improvement not part of this project.

Engineered Sidewalk Drawings

Invitation to bid

Construction Documents

(Also check School Board on the drop down menu and then Middle School Construction.)

Middle School Parking Lot/Sidewalks

CONSTRUCTION / MAINTENANCE

Slider is playing
Construction plans of the school district building